The battery passport is the first digital product passport to become truly mandatory in the EU. The date is fixed: 18 February 2027. From then on, every battery in the covered categories placed on the market needs its own electronic passport, accessible through a QR code.
Which batteries?
Under Article 77 of the Batteries Regulation (EU) 2023/1542, the passport applies to:
- electric vehicle batteries;
- light means of transport (LMT) batteries, such as e-bikes, e-scooters and electric mopeds;
- industrial batteries with a capacity above 2 kWh, for example home and business storage batteries for solar power.
Portable batteries (such as in a phone or remote control) and starter batteries do not need a battery passport. Other rules of the regulation, such as labelling, do apply to them.
Per battery, not per model
An important difference from many other product groups: the battery passport belongs to each individual battery. Two batteries of the same model each have their own passport with their own unique identifier.
What does it contain?
The regulation lists, among other things:
- identification of the battery and manufacturer;
- chemistry and material composition, including critical raw materials;
- carbon footprint;
- recycled content;
- performance and durability, such as capacity and expected lifetime;
- information on dismantling, reuse and recycling.
Part of it is public; part is only accessible to, for example, repairers, recyclers and authorities.
Who is responsible?
The company that places the battery on the EU market (manufacturer or importer). You can use a service provider to create and manage the passports, but you remain responsible.
What you can do now
- Determine which batteries are in scope. Take the DPP check.
- Request data from your suppliers: cell maker, materials, carbon footprint. This usually takes longest.
- Arrange unique identifiers per battery and a way to put the QR code on the battery.
- Choose a platform that handles passports per item, keeps versions and provides a QR code that keeps working.
- Test with a few batteries well before February 2027.
Just over three months to go. Starting now leaves time to fix mistakes before the deadline.